2019
Rockingham County Regional Water Interconnection – Phase 2

Rockingham County Regional Water Interconnection – Phase 2

This project consisted of the Installation of 9,100’ of 16” DI Watermain, 180’ of 12” DI Watermain, 17,000’ of 12” PVC Watermain, 24 Service Connections including a single 1,500’ service connection. It was completed between August 2019 and June 2020 in Rockingham County, North Carolina for the local public utility.
This project also included oversight of multiple Bore & Jack road crossings and a Directional Bore under multiple high-value assets and a waterway.

Pegg Road Development

Pegg Road Development

This project consisted of the Installation of 1,400′ of 10″/12″ DI Fire Protection Line, a 1,000′ 2″ Service Connection, a 1″ Irrigation system, 1,300′ of 6″/8″ PVC Sanitary Sewer, 2,600′ of 15″-30″ RCP Storm Drainage, and a 23,000 sqft storm pond. It was completed between June and October of 2019 for a private developer in High Point, NC.

Adkins Road Sewer

Adkins Road Sewer

This project consisted of the Installation of 4,630′ of 12″ Ductile Iron Sewer Line at a depth of 6 – 20 Feet, and included 15 4′ manholes. It was completed between February and October of 2019 for the City of High Point, North Carolina.

Villa Drive Sewer Replacement

Villa Drive Sewer Replacement

This project consisted of the Installation of 188′ of 8″ Ductile Iron Sewer Line, 305′ of 8″ Vitrified Clay Sewer Line, and 425′ of 12″ Vitrified Clay Sewer Line at a depth of 6 – 14 Feet, and included 11 4′ manholes. It was completed between April and October of 2019 for the Winston-Salem/Forsyth County Utility Commission, North Carolina.

Cambridge Park Sanitary Sewer Outfall

Cambridge Park Sanitary Sewer Outfall

This project consisted of the installation of 3,081′ 10″ SDR Sewer Line, 829′ of 10″ Ductile Iron Sewer Line, and included 24 manholes between 6-12 feet deep. It was completed between June and October of 2019 for a development in Mebane, NC.

Stoneville Sanitary Sewer Rehabilitation

Stoneville Sanitary Sewer Rehabilitation

This project consisted of the installation of 4,250′ of 8″ SDR Sewer Line, 192′ of 8″ Ductile Iron Sewer Line, and included 19 manholes between 4-16 feet deep. It was completed between April and July of 2020 for Stoneville, NC.

The Pilot at Sedgefield

The Pilot at Sedgefield

This project consisted of the installation of 4,200′ of 12″ Ductile Iron Water Main, 1,500′ of 8″ Ductile Iron Sanitary Force Main, 485′ of 8″ Ductile Iron Sewer Line, 2,875′ of 8″ PVC Sewer Line, and included 22 manholes between 4-16 feet deep. The Project also included a new Pump Station for the City of Greensboro. It was completed between March and December of 2020 for a private developer.